Metrics provide
data points that can both benefit and endanger and organization. Metrics can be used positively to build a
better organization and can be used negatively to punish organizations and
people therein. Many times, those that
use the metrics negatively do it purposefully, but other times, they are not
aware of the way they are using them. This
is why it is important to have a metrics culture that apply metrics in a
positive manner, provides an understanding of the metric, and then actually utilize
metrics to manage an organization.
Often times, an
organization collects numerous measures and generates numerous metrics. In many of these cases, it is unclear why
certain metrics are being collected. In
the long run, a majority of these metrics do not actually get used to manage an
organization. These metrics become
ignored and deemed worthless. It is the
combination of ignored metrics and the negative use of metrics that begins the
downfall of the perceived value of metrics and leads to a very negative metrics
culture.
Constructing a Value-Added Metric
There are many
challenges to establishing a positive metrics culture. One of the primary objectives to building a
positive metrics culture is to ensure they are solving a problem and designed
to be value-added.
It is important
to gather input prior to establishing metrics.
For input, consider a) uncovering problem areas in the organization, the
application team, or project and b) identifying the value-added metrics other
organizations are using. The possibility
of effectively using metrics to alleviate the pain felt by groups in certain
areas can be a big motivator to implementing metrics.
The key building
blocks to value-added metrics are: 1) ensuring the organization understands the
benefit of the metric and how it can be used to improve the organization; 2) understanding
the level of effort to collect the metrics (both establish and maintain); and 3)
providing clarity on who really benefits from and will use the metric. By
assessing the benefit vs. the effort, a value-rating can be assigned to each
metric. Those that have high
value-ratings can be implemented. Once a
metric is in place, then monitoring should occur to verify if the metric is
actually being used to manage the problem area or organizational change. If not, discard the metric.
For the sake of
this discussion, let us say that the application team has identified that build
times are a major problem and impacts delivery times to test and worse to
production. The application team is
unclear of how long they should expect a build to take and build times are
perceived to range drastically in duration.
Let's explore the key building blocks in more detail by proposing a
metric called "Time to Build the Product" within the Software Configuration
Management (SCM) field.
Understand the Benefit of the Metric
When considering the benefit of the metric,
first take a moment to describe it. In
the case of "Time to Build the Product", the description is, a metric that
determines the average duration to build (e.g., initiate, compile, package, and
smoke test) a product from start to finish.
Next consider what
areas that the metric can be used for (a.k.a., the benefits). This can be a consensus-driven discussion
where the problem it solves or the opportunities it gains are considered. Essentially, this drives the "why" (e.g., why
would we want to establish this metric).
Several examples of why the
metric can be of benefit and how it can be used to improve an application
team's effort if establishing a "Time to Build the Product" metric are:
- Identifying potential problems when there are
large deviations from average build times or when build times get longer and
longer.
- Setting customer expectations for scheduling and
planning - if it always takes 2 hours to build an application, and management
asks for a build in 30 minutes, it's much better to have hard numbers ready to explain
why that's not possible
- Measuring expected build time gains (or losses)
caused by implementing:
- New functionality in applications
- System change/improvements
- Build process changes/improvements
Determine Effort to collect the
Metric
Now that folks are aware of the benefits and
use of the metric for improvement, it is time to consider the level of effort
needed to collect the metric. This is
critical because there are many cases where the effort to collect the metric
outweighs the perceived benefit. If this
is the case, then it is not worth proceeding forward with the metric. Total
effort should include the setup effort and the ongoing maintenance effort. Here is an example of considerations in
setting up a "Time to Build the Product" metric:
- Define process
- When the build is initiated, record a time
stamp. At the start of each step in the
build process (e.g., build, compile, package, and smoke test) a
record time stamp, and at the end of the build process record another time
stamp. The data should be written into a
build log
- Determine average times for each step in the
build process.
- Automate process
- Script the process so it can automatically run
- Send output to a log (average times for each
step)
- Test the automated process
- Adjust as needed
Identify Who Benefits most from the
Metric
It is
important to identify who benefits most from the metric. Engaging with these people will help give you
an understanding if and how they may use the metric. Here
is an example of those that may benefit most from the "Time to Build the
Product" metric:
- SCM engineers for build time monitoring,
scheduling, and for having a baseline of data to improve build times
- Development for scheduling and awareness of
build time
- Project Management for scheduling and awareness
of build time
Assess Value of the Metric
Is the metric a
value to an application team or organization?
This is a critical step. Once the
benefits of the metrics are known, the effort to construct and maintain the
metrics are identified, and it is clear who will benefit from the metrics, then
a comparison of the benefits versus the effort should occur. It should include input from those that will
use the metric.
Typically the values
used to determine the effort of a build is measured in hours or days. The tricky part is to establish meaningful
values to determine the benefit of a metric.
This can be subjective from person to person. A tip is to consider how many hours in a
given year are worth setting up and maintaining a metric. Is 50 hours per year reasonable or 100? Using this value can provide a basis to
measure effort against. Then it is important to ask the people who may
benefit from the metric if the benefit is worth the effort. Using the "Time to Build the Product" metric as an example, let's compare the
perceived benefit versus the effort.
Perceived Benefit
Working with the
group that would benefit most from the metric (from the "Who benefits
most and uses the Metric" section), it
was determined that 100 hours was a reasonable amount of time to set up and
maintain a metric of this nature. Using
0-100 as the range, ask each person to determine the perceived benefit of "Time
to Build the Product" metric (from 1-100 with 100 being the highest):
Role
|
Perceived Benefit
|
SCM Engineer #1
|
80
|
SCM Engineer #2
|
90
|
Lead Developer
(representing Development)
|
60
|
Project Manager
|
70
|
Average
|
75
|
Effort
Determine the effort
to establish the "Time to Build the Product" metric. This approach looks at total effort and
includes the set-up time and the on-going effort to maintenance the
metric. Calculate the hours:
Task
|
Hours
|
Set-up Effort
(define and automate process)
|
25
|
On-going Effort
(monthly)
|
12 (1 monthly)
|
Effort per Year
|
37
|
Value
Determining value
is critical factor. If the "perceived
benefit" exceeds the "total effort hours" in a year (e.g., the "value-rating"
is greater than 1 when perceived value is divided by hours), then the metric
may be considered a value-add to the organization or application. In this case, if we divide the perceived
benefit of 75 by the total effort hours in a year of 37, we get 2.03
value-rating (rounded up). When using
this approach, you will often find that the effort is greater than the
perceived benefit (e.g., value-rating is less than 1 and should therefore not
be considered as a potential metric).
Comparing a Potential Metric
When embarking on
a metrics program, it is important to look at a number of potential metrics in
order to determine their value-rating in relation to other metrics. As stated in the early section, gather input
by a) uncovering problem areas in the organization, the application team, or
project and b) identifying what value-added metrics are used in other
organizations. Discuss the metrics with
those that would benefit from the metric and ensure they would, in fact, use
the metric for improvements.
Of those potential
metrics that remain, go through the steps described above (e.g., Understanding
the Benefit of the Metric, Determine Effort to collect the Metric, Identify Who
Benefits most from the Metric, and Assess Value of the Metric). Then compare the potential metrics
together. Here is an example of a
metrics comparison table that uses the value-rating as its gauge. Note: it includes the "Time to Build the
Product" metric discussed above:
Potential Metric Name
|
Perceived Benefit
|
Effort
|
Value-Rating
|
Time to Build
the Product
|
75
|
37
|
2.03
|
Build Errors
|
85
|
45
|
1.89
|
Code Volatility
|
45
|
60
|
0.75
|
Change Control
Volatility
|
55
|
45
|
1.22
|
In this case, we
see four potential metrics. Of the four,
the SCM metrics program may only choose to pursue the "Time to Build the
Product" and the "Build Errors" metric since it has the highest metrics
Value-Rating.
Note: there will
be times when the value-rating is below 1 but the organization still wants to
proceed with a metric. In these cases,
it is important to communicate the risk of the metric being perceived as not
adding value.
Monitoring the Metric
As time goes on,
any metric that has been established and being produced on an on-going basis, should
be revisited on a periodic basis. The
reasons are two-fold. First, it is
important to periodically check if the metric is actually being used. If it is not being used, then the metric
should be discontinued. Second, the
value-rating of the metric should be re-evaluated. Is the benefit still perceived to be high as
time moves forward? Is the effort more
or less than what was initially calculated?
In some cases, once a metric is used and drives a positive change in the
organization, then the metric has done its job and may no longer need to be
generated (or generated less frequently then on a monthly basis).
Also, it is
important to let collect the metric data for a few cycles prior to prescribing
a target for a metric. It is important
to identify the range of scores a metric produces over a reasonable time period
to understand what "average" is and what are variations. Once this is done, then a target for
improvement can be considered.
Summary
Constructing value-added metrics are a must. The metric must be perceived to solve
problems or improve the life of those in the organization or application team. It is important to understand the benefit of
the metric, determine the effort to collect the metric, identify who benefits
most from the metric, and assess value of the metric in the form of a value-rating. When a metric or set of metrics are
established, then monitor the metrics to ensure the value-rating remains
constant and that the metrics actually get used to manage the business. This also ensures a healthy and dynamic
metrics program. As old metrics lose
their value-rating because they have either done their job in improving the
organization or are not being used, then new metrics can be considered to solve
new problems or improve the organization in new ways.
About the Author
Mario Moreira is a Columnist for CM Journal, a VP of Technology, an Author of CM publications, and has worked in the SCM field since 1986. He has experience with numerous SCM technologies and processes and has implemented SCM on over 100 applications/products, which include establishing global SCM infrastructures. He has an MA in Mass Communication with an emphasis on communication technologies. Mario also brings years of Project Management, Software Quality Assurance, Requirement Engineering, IT Governance Architecture, Methodology, and team building skills and experience.